Land ClearingCorfu
  1. Home
  2. Services
  3. Swimming Pool Excavation
Septic, Water & Pools · Corfu

Swimming pool excavation in Corfu

The pit for your pool, dug to the builder's dimensions with a mini excavator that fits small gardens, and the soil taken away.

  • Free quote from photos
  • Small machines, tight access
  • Everything hauled away

Digging the hole for your pool

Every pool starts with a hole, and getting the hole right saves time and money later. Your pool builder or engineer gives the shape, depth and levels; we dig to them, including the extra room needed around the shell for working space and the gravel or concrete base.

A mini excavator is ideal for this: it gets into gardens and through gates where a large digger cannot go, and it digs accurately. The catch is the spoil. A pool 8 by 4 metres and 1.5 metres deep removes about 48 cubic metres of ground, and once dug the soil takes up around a quarter more space. That is a lot of trailer loads, so plan early where the soil goes: spread on your land, used for levelling or hauled away.

Corfu ground can be soft soil, clay or hard rock, sometimes in the same hole. If we hit rock or groundwater, we tell you immediately so you and your builder can decide. Once the pool shell is built, we come back for the backfill around the pool. Pool works normally need approval, which your builder or engineer handles.

What's included

  • Pool pit dug to your builder's dimensions and levels
  • Working space and base depth excavated as specified
  • Steps, shelves and deep end shaped as required
  • Trenches for pipes, electrics and the equipment room
  • Spoil spread on site or hauled away by tractor and trailer
  • Access prepared for concrete and equipment where needed

How the job works

  1. Plans and setting-out

    Your pool builder or engineer gives the dimensions, levels and position. We check access and where the soil will go.

  2. Strip and dig

    We strip the topsoil, then dig in layers to depth, checking levels as we go.

  3. Trim and hand over

    The bottom and sides are trimmed and handed over to the pool builder.

  4. Clear the spoil

    Soil is spread or hauled away, and we return for the backfill when the shell is done.

Plan the spoil

A pool creates far more soil than most owners expect. Decide early whether you want it spread in the garden, used for terracing or taken away. Rock and water can change the price, so tell us what you know. If the garden needs clearing first, see plot clearing and stump removal.

FAQ

Common questions

Can a mini excavator dig a whole pool?

Yes, for most private pools. It digs in layers and gets in through narrow access. Very large pools take longer.

How much soil does a pool create?

A pool 8 x 4 m and 1.5 m deep is about 48 cubic metres in the ground and roughly 60 once dug. We can estimate for your size.

What if we hit rock or water?

We stop and tell you. Rock may need a breaker and water needs pumping; both change time and cost.

Do you build the pool?

No. We do the excavation and the backfill; a pool builder builds and finishes it.

Contact

Tell us about your land

The quickest way to a quote is WhatsApp. Send photos and a location pin, or fill in the form and it will open a ready-made message for you.

WhatsApp+30 697 716 1044
Call+30 697 716 1044
Service areaAll of Corfu

Request a free quote

Takes 30 seconds. This opens WhatsApp with your details filled in, then add your photos.

Or call +30 697 716 1044

WhatsApp
Call WhatsApp