Swimming pool excavation in Corfu
The pit for your pool, dug to the builder's dimensions with a mini excavator that fits small gardens, and the soil taken away.
- Free quote from photos
- Small machines, tight access
- Everything hauled away
Digging the hole for your pool
Every pool starts with a hole, and getting the hole right saves time and money later. Your pool builder or engineer gives the shape, depth and levels; we dig to them, including the extra room needed around the shell for working space and the gravel or concrete base.
A mini excavator is ideal for this: it gets into gardens and through gates where a large digger cannot go, and it digs accurately. The catch is the spoil. A pool 8 by 4 metres and 1.5 metres deep removes about 48 cubic metres of ground, and once dug the soil takes up around a quarter more space. That is a lot of trailer loads, so plan early where the soil goes: spread on your land, used for levelling or hauled away.
Corfu ground can be soft soil, clay or hard rock, sometimes in the same hole. If we hit rock or groundwater, we tell you immediately so you and your builder can decide. Once the pool shell is built, we come back for the backfill around the pool. Pool works normally need approval, which your builder or engineer handles.
What's included
- Pool pit dug to your builder's dimensions and levels
- Working space and base depth excavated as specified
- Steps, shelves and deep end shaped as required
- Trenches for pipes, electrics and the equipment room
- Spoil spread on site or hauled away by tractor and trailer
- Access prepared for concrete and equipment where needed
How the job works
Plans and setting-out
Your pool builder or engineer gives the dimensions, levels and position. We check access and where the soil will go.
Strip and dig
We strip the topsoil, then dig in layers to depth, checking levels as we go.
Trim and hand over
The bottom and sides are trimmed and handed over to the pool builder.
Clear the spoil
Soil is spread or hauled away, and we return for the backfill when the shell is done.
Plan the spoil
A pool creates far more soil than most owners expect. Decide early whether you want it spread in the garden, used for terracing or taken away. Rock and water can change the price, so tell us what you know. If the garden needs clearing first, see plot clearing and stump removal.
Common questions
Can a mini excavator dig a whole pool?
Yes, for most private pools. It digs in layers and gets in through narrow access. Very large pools take longer.
How much soil does a pool create?
A pool 8 x 4 m and 1.5 m deep is about 48 cubic metres in the ground and roughly 60 once dug. We can estimate for your size.
What if we hit rock or water?
We stop and tell you. Rock may need a breaker and water needs pumping; both change time and cost.
Do you build the pool?
No. We do the excavation and the backfill; a pool builder builds and finishes it.
Related services
Jobs that often go with this one. View all services
Pool Backfilling & Filling In
Compacted backfill around new pools, and safe filling of old ones.
See detailsFoundation Excavation
Trenches and pits dug to your engineer's levels for footings and slabs.
See detailsRubble Removal & Hauling
Building rubble, renovation debris and excavation spoil loaded and hauled away.
See detailsTrenches, Pipes & Cable Runs
Neat trenches for water, electricity, irrigation and drainage lines.
See detailsTell us about your land
The quickest way to a quote is WhatsApp. Send photos and a location pin, or fill in the form and it will open a ready-made message for you.